![Mould in Buildings and HVAC Systems](https://www.agcoombs.com.au/wp-content/uploads/2024/06/Wordpress-Hero-Shot-360x190.jpg)
June 24, 2024 in Advisory Notes
Mould in Buildings and HVAC Systems
Mould plays an important role in the natural environment as a break-down mechanism for dead organic matter. In the built environment, it is an unwante...
Engaged by Property Investment Group, Investa, A.G, Coombs completed Boiler Replacement works located in the Plant Room on level 3 of 567 Collins St.
The existing boiler was originally installed in September 2014 and was showing signs of wear and a reduction in overall reliability and performance.
As a result, A.G. Coombs Advisory were engaged to work closely with Investa and client-side CBRE to produce a Scope of Works for the replacement of the equipment.
A.G. Coombs Advisory started by submitting a detailed Scope of Works for the installation of two (2) condensing water heaters and one (1) modular heater condensing bank to replace the existing heating plant.
Due to the nature of the work and the timing required, CBRE requested to negotiate the construction with A.G. Coombs Projects. An ‘end-to-end’ solution was requested by both CBRE and Investa which A.G. Coombs Advisory and Projects were able to deliver.
Central to the success of this project, A.G. Coombs engaged with the Investa and CBRE to carefully plan the changeover of this critical infrastructure without losing the ability to provide hot water to various systems throughout the building.
The A.G. Coombs Projects team produced a detailed plan for the implementation of the plant changeover and executed that plan without disruption to the building’s operations.
Additional works required as part of the project scope included in the following works:
For more information on this project please contact A.G. Coombs at www.agcoombs.com.au/contact-us/
Project Name: 567 Collins Street - Boiler Replacement
Location: Melbourne, Victoria
Client: Investa and CBRE
Year Completed: 2019
Boiler Replacement
June 24, 2024 in Advisory Notes
Mould plays an important role in the natural environment as a break-down mechanism for dead organic matter. In the built environment, it is an unwante...
June 21, 2024 in News
A.G. Coombs’ commitment to bringing its Innovate Reconciliation Action Plan to life goes beyond actioning its own initiatives and extends to the way...
May 30, 2024 in News
A.G. Coombs with LCI Consultants for Sydney’s Allianz Stadium, Mechanical & HVAC Services has been selected as the winner in the Project Excellen...
May 21, 2024 in News
Australia’s largest HVAC&R and building services event – ARBS 2024 will be held in Sydney from 28-30 May.Hosting over 340 exhibitors and expec...