June 24, 2024 in Advisory Notes
Mould in Buildings and HVAC Systems
Mould plays an important role in the natural environment as a break-down mechanism for dead organic matter. In the built environment it is an unwanted...
August 22, 2017
Although the intent of workplace health and safety regulations are clear, the discharge of safety-in-design responsibilities is a complex area that is not widely understood across the Australian HVAC&R industry.
In the August edition of the AIRAH Ecolibrium magazine Sean McGowan takes a closer look at the main issues confronting our industry with a number of experts including Warwick Stannus, Manager – A.G. Coombs Group Engineering.
“My plain-English definition is that a designer of a workplace must assure, so far as is reasonably practical, that it will be without risks to the health and safety of future users of the workplace” says Stannus.
He goes onto add that the safety-in-design process begins in pre-design and carries through to final handover. “It applies the principles of risk management to the design process to assure, as far as reasonably practical, that the building can be safely constructed, operated and maintained through its life cycle, including its ultimate removal or replacement.”
View the full article here.
More information AIRAH’s Ecolibrium publication is available here.
June 24, 2024 in Advisory Notes
Mould plays an important role in the natural environment as a break-down mechanism for dead organic matter. In the built environment it is an unwanted...
February 12, 2020 in Our Experience
A state-of-the-art redevelopment of Goulburn Valley Health in Shepparton will deliver new and expanded healthcare facilities to meet the growing commu...
March 2, 2017 in News
Join the AIRAH Victorian committee on Wednesday the 15th March at Karstens, 123 Queen Street Melbourne, as A.G. Coombs Group Engineering Manager Warwi...
February 27, 2017 in Advisory Notes
Building Operators have the onus to manage the residual risks from Safety-in-Design decisions and, as such, should be actively engage in both the init...