July 4, 2016 in News
A.G. Coombs awarded another PEQ contract
A.G. Coombs Projects has been appointed by Managing Contractor, CPB Contractors (formally Leighton Contractors), to deliver mechanical and HVAC servic...
December 8, 2017
The new Post Entry Quarantine (PEQ) facility was built to consolidate Australia’s four existing PEQ operations. Located on a 144 hectare site in Mickleham Victoria it will become the first point of entry for all imported animals, plant material and insects. Across multiple buildings the facility features some of the most sophisticated and high-quality HVAC systems in Australia.
In the December edition of the AIRAH Ecolibrium magazine Sean McGowan takes a closer look at the country’s flagship quarantine control facility.
The article looks at the challenges in designing and delivering a mission critical facility with such strict requirements for containment and an incredibly diverse range of mechanical services and air conditioning and ventilation systems.
A.G. Coombs is the specialist mechanical and HVAC services contractor for the $380 million project.
Further details on the new Post Entry Quarantine (PEQ) facility are available on the Australian Government website.
July 4, 2016 in News
A.G. Coombs Projects has been appointed by Managing Contractor, CPB Contractors (formally Leighton Contractors), to deliver mechanical and HVAC servic...
May 5, 2016 in Our Experience
A.G. Coombs Projects and Walker Fire Protection helped to deliver the new PEQ facility.
October 25, 2014 in News
A.G. Coombs Projects has been appointed by Managing Contractor, Leighton Contractors, to deliver mechanical and HVAC services to the first three stage...